product description
CPR-415F is a professional two-component adhesive for prefabricated runway paving.
2. Technical parameters
CPR-415F | Component A | Component B |
Appearance | red. | Brown |
Scale (weight ratio) | 5 | 1 |
Viscosity (25 ° C, cps) | 20000 + 5000 | 200 + 50 |
Specific gravity (g/cm3) | 1.45 | 1.25 |
Operating time after mixing (min, 25 ° C) | 60 + 20 | |
Initial curing time (h, 25 ° C) | 4 to 5 | |
Final curing time (h, 25 ° C) | 72 | |
Characteristics
1. easy construction, room temperature curing;
2. no solvent, no formaldehyde release, no volatilization of any harmful substances when used, environmental protection, in line with the national standard 《36246-2018 》。
3. Fast curing, high bonding strength, waterproof, mildew proof, weather resistant, acid resistant, alkali resistant, gasoline resistant;
4. long low temperature activation period, drying fast in high temperature.
Application
Used for prefabricated runway material pavement.
5. Construction process
1. Foundation treatment: First of all, the construction site needs to be basic treatment to ensure that the ground is smooth and strong. This includes cleaning debris, filling potholes, leveling the ground and other work.
2 Base coating: After the base treatment is completed, the construction of the base coating needs to be performed. The basic coating is usually bonded with a special adhesive, which can enhance the bonding force between the ground and the plastic runway.
3. Special adhesive construction: After the construction of the basic coating is completed, the component B is poured into the component A, and the color is uniform for 2-3 minutes. Then the construction can be completed. Adhesive is an important material for bonding the prefabricated plastic track and the base coating together.
4. Prefabricated plastic runway installation: After completing the construction of the adhesive, it is necessary to pave the prefabricated plastic runway on the base coating. When paving, attention should be paid to maintaining the smoothness and straightness of the runway to ensure that the runway has good performance.
5. Wait for curing: After paving is completed, it is necessary to wait for a certain time for curing. Curing time will vary depending on the material and climate conditions and usually takes a few days to a few weeks.
6. Equipment cleaning
The uncured colloid can be removed from the tool or equipment by vinyl acetate, tena water, acetone, and once cured, it can only be removed by mechanical method.
Seven, product protection
The product should be isolated from air and away from the source of fire.
8. Packaging
30kg/ group (25kg/ barrel for component A and 5kg/ barrel for component B).