cpp
E-mail:marketing@gzgbs.com
Add:No. 15 Nanxiang Third Road, Science City, Luogang District, Guangzhou City
TEL020-66610777
Parameter
Product description
GBS CPP series color permeable pavement adhesive (CPP-541s, CPP-541, CPP-541W, etc.) is a two-component solvent-free high-performance adhesive, which can be mixed with gravel, ceramic particles, glass beads, colored sand and other aggregates to spread on pervious concrete, ordinary concrete and asphalt and other structural layers to prepare high-grade decorative color permeable pavement.
Application
Color permeable pavement conforms to the environmental protection concept of "sponge city”,mainly used for highways, tunnels, squares, parking lots, sidewalks,suitable for traffic flow and load smaller roads, such as schools, community streets, villa parks, landscape areas, swimming pools, parks and other parts.
Characteristics
★ 100% solvent-free environmentally friendly material, no poison .no taste;
★Consistent elasticity with asphalt substrate, no cracking in cold or hot areas;
★ Low viscosity, it can seal the concrete substrate without interface agent;
★ Long operation time, easy to site construction;
★ strong tinctorial power , can cover the original color of aggregate;
★ Strong wettability for substrate and aggregate, high bonding strength.
Technical data
Name of the product | Summer Edition CPP-541S | Spring and autumn edition CPP-541 | Winter edition CPP-541W | |||
Main dose (A) | Curing agent (B) | Main agent (A) | Curing agent (B) | Main agent (A) | Curing agent (B) | |
Appearance | Multiple colors | Pale yellow | Multiple colors | Pale yellow | Multiple colors | Pale yellow |
Mixing viscosity (cps/25℃) | 7000 + 2000 | 7000 + 2000 | 7000 + 2000 | |||
Application period (25℃, 100g) | 120±10min (35℃) | 90±10min (25 ° C) | 40±10min (20 ° C) | |||
Surface dry time/open traffic time | 3~4h | 3~4h | 3 ~ 4h | |||
Basic curing time (25 ° C) | 24h | 24h | 24h | |||
Final curing time (25℃) | 72h | 72h | 72h | |||
Tensile shear strength (MPa, beech) | ≥6Mpa | ≥6Mpa | ≥6Mpa | |||
Water resistance | Soak in water for 24h without abnormal phenomenon | Soak in water for 24h without abnormal phenomenon | Soak in water for 24h without abnormal phenomenon | |||
Alkaline resistance | Soak in calcium hydroxide saturated solution for 24h without abnormal phenomenon | Soaking in saturated calcium hydroxide solution for 24h has no abnormal phenomenon | Soaking in saturated calcium hydroxide solution for 24h has no abnormal phenomenon | |||
Acid resistance | Soak in 1%H2SO4 solution for 24h without abnormality | Soak in 1%H2SO4 solution for 24h without abnormal phenomenon | Soak in 1%H2SO4 solution for 24h without abnormal phenomenon | |||
Low temperature crack resistance | Keep at -10℃ for 4h, place at room temperature for 4h as a cycle, no cracks after three consecutive cycles | Keep at -10℃ for 4h, place at room temperature for 4h as a cycle, no cracks after three consecutive cycles | Keep at -10℃ for 4h, place at room temperature for 4h as a cycle, no cracks after three consecutive cycles | |||
Artificially accelerated weather resistance | After the artificial accelerated aging test, the coating of the test plate does not crack and flake; Slight pulverization and discoloration are allowed | After the artificial accelerated aging test, the coating of the test plate does not crack and flake; Slight pulverization and discoloration are allowed | After the artificial accelerated aging test, the coating of the test plate does not crack and flake; Slight pulverization and discoloration are allowed | |||
6. Construction process
★ Before use, the base road surface should be compacted without settlement, with good flatness, clean, dry, and free of any loose debris;
★ According to the correct A/B ratio weighing (strictly follow the proportion), mix evenly with the aggregates within 15 minutes, and spread the mixed materials within 30 minutes;
★ Find the elevation according to the horizontal standard line and the design thickness. Mixed stone material spread at the base, with a scraper, rake and other tools to scrape, slightly higher than the elevation control line, first use a special low-frequency vibrator to flatten, and then use a special surface layer collector to flatten, fill, and finally flatten, the surface layer as a whole to achieve smooth, uniform, no holes. The side line is responsible for handling. ;
★ Ensure that no vehicles or people walk on it within 4 to 6 hours, and no debris falls on the surface layer, and then traffic can be opened.
Seven, packaging, dosage and storage
★ Two components, A/ B total 30kg/ group, group supply;
★ Dosage: aggregate and adhesive weight ratio of 5 ~ 30:1, according to the roughness of the aggregate and the required thickness of the difference;
★ Storage and transportation: according to flammable dangerous goods storage and transportation, dry and cool storage and transportation.






