cpp

E-mail:marketing@gzgbs.com

Add:No. 15 Nanxiang Third Road, Science City, Luogang District, Guangzhou City

Contact

TEL020-66610777

Parameter

Product description

GBS CPP series color permeable pavement adhesive (CPP-541s, CPP-541, CPP-541W, etc.) is a two-component solvent-free high-performance adhesive, which can be mixed with gravel, ceramic particles, glass beads, colored sand and other aggregates to spread on pervious concrete, ordinary concrete and asphalt and other structural layers to prepare high-grade decorative color permeable pavement.

Application 

Color permeable pavement conforms to the environmental protection concept of "sponge city”,mainly used for highways, tunnels, squares, parking lots, sidewalks,suitable for traffic flow and load smaller roads, such as schools, community streets, villa parks, landscape areas, swimming pools, parks and other parts.

Characteristics

★ 100% solvent-free environmentally friendly material, no poison .no taste;

★Consistent elasticity with asphalt substrate, no cracking in cold or hot areas;

★ Low viscosity, it can seal the concrete substrate without interface agent;

★ Long operation time, easy to site construction;

★ strong tinctorial power , can cover the original color of aggregate;

★ Strong wettability for substrate and aggregate, high bonding strength.

 

Technical data

Name of the product

Summer Edition

CPP-541S

Spring and autumn edition

CPP-541

Winter edition CPP-541W

Main dose (A)

Curing agent (B)

Main agent (A)

Curing agent (B)

Main agent (A)

Curing agent (B)

Appearance

Multiple colors

Pale yellow

Multiple colors

Pale yellow

Multiple colors

Pale yellow

Mixing viscosity (cps/25℃)

7000 + 2000

7000 + 2000

7000 + 2000

Application period (25℃, 100g)

120±10min (35℃)

90±10min (25 ° C)

40±10min (20 ° C)

Surface dry time/open traffic time

3~4h

3~4h

3 ~ 4h

Basic curing time (25 ° C)

24h

24h

24h

Final curing time (25℃)

72h

72h

72h

Tensile shear strength (MPa, beech)

≥6Mpa

≥6Mpa

≥6Mpa

Water resistance

Soak in water for 24h without abnormal phenomenon

Soak in water for 24h without abnormal phenomenon

Soak in water for 24h without abnormal phenomenon

Alkaline resistance

Soak in calcium hydroxide saturated solution for 24h without abnormal phenomenon

Soaking in saturated calcium hydroxide solution for 24h has no abnormal phenomenon

Soaking in saturated calcium hydroxide solution for 24h has no abnormal phenomenon

Acid resistance

Soak in 1%H2SO4 solution for 24h without abnormality

Soak in 1%H2SO4 solution for 24h without abnormal phenomenon

Soak in 1%H2SO4 solution for 24h without abnormal phenomenon

Low temperature crack resistance

Keep at -10℃ for 4h, place at room temperature for 4h as a cycle, no cracks after three consecutive cycles

Keep at -10℃ for 4h, place at room temperature for 4h as a cycle, no cracks after three consecutive cycles

Keep at -10℃ for 4h, place at room temperature for 4h as a cycle, no cracks after three consecutive cycles

Artificially accelerated weather resistance

After the artificial accelerated aging test, the coating of the test plate does not crack and flake; Slight pulverization and discoloration are allowed

After the artificial accelerated aging test, the coating of the test plate does not crack and flake; Slight pulverization and discoloration are allowed

After the artificial accelerated aging test, the coating of the test plate does not crack and flake; Slight pulverization and discoloration are allowed

6. Construction process

★ Before use, the base road surface should be compacted without settlement, with good flatness, clean, dry, and free of any loose debris;

★ According to the correct A/B ratio weighing (strictly follow the proportion), mix evenly with the aggregates within 15 minutes, and spread the mixed materials within 30 minutes;

★ Find the elevation according to the horizontal standard line and the design thickness. Mixed stone material spread at the base, with a scraper, rake and other tools to scrape, slightly higher than the elevation control line, first use a special low-frequency vibrator to flatten, and then use a special surface layer collector to flatten, fill, and finally flatten, the surface layer as a whole to achieve smooth, uniform, no holes. The side line is responsible for handling. ;

★ Ensure that no vehicles or people walk on it within 4 to 6 hours, and no debris falls on the surface layer, and then traffic can be opened.

Seven, packaging, dosage and storage

★ Two components, A/ B total 30kg/ group, group supply;

★ Dosage: aggregate and adhesive weight ratio of 5 ~ 30:1, according to the roughness of the aggregate and the required thickness of the difference;

★ Storage and transportation: according to flammable dangerous goods storage and transportation, dry and cool storage and transportation.